Construction continues at Founders Place amidst the consistent snowfall. A few construction highlights include:

  • Foundation walls at Edgar West with structural columns awaiting the post-tension concrete deck pour. Great news is that the materials for this critical step are already onsite.
  • General routing of the future primary driveway along Deer Hollow Road.
  • First level of concrete stair towers for Edgar West have been poured.

View the construction progress live via this link.

Below are a few drone videos that were taken to show the tower crane working to remove 64” of snow that fell over the few days surrounding New Year’s Eve. This work will allow the construction team to pour the first Edgar East concrete footings.

360° drone video from approximately 300 feet above the site. 

Pull back drone video looking to the west. 

With incredible sales success, there are only three homes left!

Families are sharing that they are excited about; the slope side access, architecture and design, broad amenity and service package, views, private gated location, southern sunshine, hiking/biking access, and private car service to name a few.

This is a listing by Matt Magnotta & Patrick Howell Berkshire Hathaway.